Rwanda

Rwanda

RURA Lead time: 3-4 weeks Needed document Application Manual LoA CE DoC Datasheet Photos All the test reports stated on the DoC 2 copies of type approval certificates from ITU region 1 (Optional) Sample: 1 ea normal Validity: Permanent Rate voltage Rated Voltage 230 V...
Nigeria

Nigeria

NCC (Wireless) Lead time: 7-8 weeks Needed document LoA RED technical files (DoC and all the corresponding test reports less than 5 year) Datasheet / operational description Manual Application Samples: 1 ea normal Validity: Permanent   SONCAP (Pre-shipment...
Niger

Niger

ARCEP Lead time: 9 weeks Needed document Application Manual LoA CE DoC Datasheet Photos All the test reports stated on the DoC Sample: N/A Validity: 10 years Rate voltage Rated Voltage 220 V Frequency 50 Hz Plug Standard             Certificate ARCEP _ Niger...
Namibia

Namibia

CRAN Lead time: 5-6 weeks Needed document Application Manual LoA CE DoC Datasheet Photos All the test reports stated on the DoC RF & EMC & Health and Safety reports comes with a DoC issued by an aaccredited Lab. Radio compliance certificate and report if...