FCC (EMC / Wireless)

  • Lead time: 4 weeks
  • Needed document
    • Application
    • Manual
    • Antenna specification
    • Circuit
    • Part location
    • Photo of product

  • Testing: Yes
  • Sample: 1 ea conducted & 1 ea normal

NRTL (Safety)

  • Lead time: 7 ~ 8 weeks
  • Needed document
    • Application
    • Manual
    • Circuit
    • CCL 
    • BOM (Bill of Material)
    • Label draft
    • Product specification

  • Testing: Yes
  • Sample: 3 ea normal

Rate voltage

Rated Voltage 120 V
Frequency 60 Hz
Plug Standard          

 

Certificate

FCC Grant

Label

FCC