UA RED

  • Lead time: 4-5  weeks
  • Needed documents
    • Application
    • Manual
    • EU Technical Construction File (TCF) in accordance with 2014/53/EU (RED): PoA from the manufacturer
    • General product description (photos, internal layout, marking, technical specification, manual)
    • Technical design (technological drawings and component diagrams, electrical circuits)
    • Manufacturer’s DoC
    • CB/CE test reports (LVD, EMC, RF, RoHS, EMF, …)
    • QMS certificate (ISO9001 or other)
    • Software or hardware configuration if it’s type or revision level may affect compliance
    • EU-Type Examination (Module B) certificate
    • Risk assessment report
  • Validity: Permanent

UA RoHS

  • Lead time: 2-3  weeks
  • Needed documents
    • Application
    • Manual in Ukranian
    • CE RoHS test reports
    • CIG023
    • SPEC
    • LAbel in Ukranian
    • PoA
  • Validity: Permanent

Rate voltage

Rated Voltage 220 V AC
Frequency 50 Hz
Plug Standard

 

Certificate

UA RED _ Ukraine

Label

UA RF

Ukraine