CAK = CCK (Radio/Wireless)
- Lead time: 4-5 weeks
- Needed document
- Application
- Manual
- RED Technical files
- Technical specification
- Direct LoA
- Sample: 1 ea normal (tablet, PC, Smartphones…)
- Validity: 6 months (after, lengthen of certificate renewal)
KEBS (Pre-shipment inspection)
- Lead time: 1 – 2 week
- Needed document
- Invoice
- Packing List
- Test reports
- Business license
- ISO9001
All national certifications require a real audit and additional costs will be incurred.
Rate voltage
Rated Voltage | 240 V |
---|---|
Frequency | 50 Hz |
Plug Standard | ![]() |