CAK = CCK (Radio/Wireless)

  • Lead time: 4-5 weeks
  • Needed document
    • Application
    • Manual
    • RED Technical files
    • Technical specification
    • Direct LoA
  • Sample: 1 ea normal (tablet, PC, Smartphones…)
  • Validity: 6 months (after, lengthen of certificate renewal)

KEBS (Pre-shipment inspection)

  • Lead time: 1 – 2 week
  • Needed document
    • Invoice
    • Packing List
    • Test reports
    • Business license
    • ISO9001

All national certifications require a real audit and additional costs will be incurred.

 

Rate voltage

Rated Voltage 240 V
Frequency 50 Hz
Plug Standard

 

Rate voltage

Certificate

Label