ARCEP

  • Lead time: 8 weeks
  • Needed document
    • Application
    • Manual
    • LoA
    • Technical documents (CE DoC, Datasheet, Photos, all the test reports stated on the DoC)
  • Sample: N/A
  • Validity: 5 years

Rate voltage

Rated Voltage 220 V
Frequency 50 Hz
Plug Standard          

 

Certificate

Label