UA RED Lead time: 4-5 weeks Needed documents Application Manual EU Technical Construction File (TCF) in accordance with 2014/53/EU (RED): PoA from the manufacturer General product description (photos, internal layout, marking, technical specification, manual)...
Serbia
RATEL (Wireless) Lead time: 7-8 weeks Needed document Application Manual EU Technical Construction File (TCF) in accordance with 2014/53.EU (RED): PoA from the manufacturer General product description (Photos, internal layout, marking, spec) Technical design...
Georgia
CE or FCC can coverRate voltage Rated Voltage 220 V Frequency 50 Hz Plug Standard CertificateLabel
UK
CE EMC Lead time: 2 ~ 3 weeks Needed document Application Manual Testing: N/A Sample: 1 ea normal (just for operating) CE RF (Wireless / Radio) Lead time: 4 weeks Needed document Application Manual Circuit Block Diagram Antenna report Layout Testing: Yes Sample: 1 ea...
Switzerland
CE EMC Lead time: 2 ~ 3 weeks Needed document Application Manual Testing: N/A Sample: 1 ea normal (just for operating) CE RF (Wireless / Radio) Lead time: 4 weeks Needed document Application Manual Circuit Block Diagram Antenna report Layout Testing: Yes Sample: 1 ea...
Sweden
CE EMC Lead time: 2 ~ 3 weeks Needed document Application Manual Testing: N/A Sample: 1 ea normal (just for operating) CE RF (Wireless / Radio) Lead time: 4 weeks Needed document Application Manual Circuit Block Diagram Antenna report Layout Testing: Yes Sample: 1 ea...
Norway
CE EMC Lead time: 2 ~ 3 weeks Needed document Application Manual Testing: N/A Sample: 1 ea normal (just for operating) CE RF (Wireless / Radio) Lead time: 4 weeks Needed document Application Manual Circuit Block Diagram Antenna report Layout Testing: Yes Sample: 1 ea...