Taiwan

Taiwan

NCC Lead time:  Needed document Application Manual Photo Documentation (in color showing exterior and interior) Specification of product and antenna Block diagram / Circuit diagram Declaration of model differences Certificate of RF equipment business license...
Sri Lanka

Sri Lanka

TRC (Radio/Wireless) Lead time: 2 weeks (For cellular, 6 weeks) Needed document Application Manual FCC  / CE  Technical files Technical specification Photos Sample: N/A (For cellular, 1 ea normal) Validity: 3 years (For cellular, 3 years) Rate voltage Rated Voltage...
Singapore

Singapore

IMDA(wireless/radio) Lead time: 3-4 weeks Needed document Application Manual Local representative information CE test report Sample requirement: N/A Validity: 5 years PSB/CoC (EMC/Safety) Lead time: 6 weeks Needed document Application Manual CB and CB test report...
Philippines

Philippines

NTC (Telecommunication and Wireless) Lead time: 2-3 weeks Needed documents Application letter Equipment description, data sheet & RF/Technical spec Letter of authorization from the equipment manufacturer to local applicant / agent Local testing: Yes (except RCE)...
Pakistan

Pakistan

PTA (Radio/Wireless) Lead time: 5-6 weeks Needed document Application Manual CE  Technical files Technical specification Photos Sample: 1ea normal & 1ea conducted Validity: Permanent Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard      ...
Nepal

Nepal

NTA (Wireless/radio) Lead time: 12 weeks Needed document Application Manual Technical specification CE test report Sample: N/A Validity: 5years   Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard   Certificate...