NTC (Telecommunication and Wireless)
- Lead time: 2-3 weeks
- Needed documents
- Application letter
- Equipment description, data sheet & RF/Technical spec
- Letter of authorization from the equipment manufacturer to local applicant / agent
- Local testing: Yes (except RCE)
- Validity: Pernament
Safety
1. ICC (Application and test / per shipment)
- Lead time: 2 months
- Needed documents
- Application
- Packing list
- Certified True Copy of Import Entry
- Commercial Invoice
- Bill of Landing / Airway Bill
- Certified True Copy of Custom Examiner’s finding
- DTI (Department of Trade and Industry Business Registration / Security and Exchange Commission (SEC) Registration
- Summary of serial number / product number of products in the mandatory standard
- Power of Attorney; When a general company delegates an ICC application to someone else
- Board Resolution; When a corporation or limited company delegates an ICC application to another person
- Original test report tested by DTI-approved country-specific laboratories (only required)
- Sample: 10 ea
Safety
2. PS Mark (Factory audit + safety test / Annual inspection with 3 years)
- Lead time: 3 months
- Needed documents
- Application
- Quality manual
- PCIMS Account
- Brief description of the manufacturing process
- Reference No. of the product identification file (process flow, materials, process control)
- Label copy / label / logo
- Map around the factory
- Listing of measuring and testing equipment with nominal capacities and serial numberes at each inspection point and final product testing together with the evidence of ownership, such as official receipts.
- Brief description of equipment maintenance and calibration program for all testing and measuring equipment with their corresponding calibration certificates
- Sample: 10 ea
Rate voltage
Rated Voltage | 220 V |
---|---|
Frequency | 60 Hz |
Plug Standard | ![]() ![]() ![]() |
Certificate
Label