SDPPI

1. Paper work

  • Lead time:1-2 weeks
  • Needed document
    • Application
    • Manual
    • Spec
    • RF and EMC test report from SDPPI – accredited Lab
    • MoU/Distributor agreement between brand holder and applican
    • FR. PM. 5
  • Sample: N/A
  • Validity: 3 years
  • Remark: local importer information needed

2. Testing

  • Lead time: 12 weeks
  • Needed document
    • Application
    • Manual
    • CE EMC / RF
    • CE LVD or CB
    • ISO 9001
    • SoP with testing guide
    • Circuit diagram
    • Block diagram
    • Label draft
  • Sample: 1ea normal / 1ea conducted sample
  • Validity: 3 years
  • Remark: local importer information needed

SNI (Safety)

  • Lead time: 12 weeks
  • Needed document
    • Application
    • Manual in English
    • Indonesian trade mark registration or certificate
    • ISO9001
    • Business License (Need to be translated into Bahasa using sworn translator)
    • MoU from manufacture to local representative in Indonesia
    • CDF file
    • Label
    • BOM
    • Circuit Diagram
    • Block Diagram
  • Sample: N/A
  • Validity: 3 years

Rate voltage

Rated Voltage 230 V
Frequency 50 Hz
Plug Standard    

 

Certificate

ACMA_Australia

Label

SDPPI

Indonesia