SRRC (Radio/Wireless)

  • Lead time: 9 weeks
  • Needed document
    • Application
    • Manual
    • RF component list
    • Antenna gain
    • Label
    • Photos
  • Sample: 5 ea Conducted

CCC (Safety)

  • Lead time: 6 weeks
  • Needed document
    • Application
    • Manual
    • CCL
    • Business license
    • Etc.
  • Sample: 2 ea normal

Rate voltage

Rated Voltage 220VAC(one-phase)/ 380VAC(3-phase)
Frequency 50Hz
Plug Standard

GB2099.1 + GB1002(2-pin) or GB1003(3-pin)

 

Certificate

Label

SRRC