Asia

Asia
Iran

Iran

CRA (Radio/Wireless) Lead time: 6 weeks Needed document Application Manual CE  Technical files Technical specification Photos Sample: Yes (Need to check) Validity: 3 Years Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard         ...

Turkmenistan

Turkmenistan

CE or FCC can coverRate voltage Rated Voltage 220 V Frequency 50 Hz Plug Standard           CertificateLabel

Japan

Japan

Rate voltage Rated Voltage 100 V Frequency 50 Hz / 60 Hz Plug Standard             CertificateLabel

Afghanistan

Afghanistan

CE or FCC can cover Rate voltage Rated Voltage 220 V Frequency 50 Hz Plug Standard           CertificateLabel

Vietnam

Vietnam

VNTA (Wireless) Lead time: 4 weeks Needed document Application Manual in English Inner / Exterior pictures Sample: 1 ea normal with all accessories Local testing: Yes Validity: 2 years EMC testing Lead time: 3-4 weeks Needed document Application Manual in English...

Thailand

Thailand

Update Information   NBTC: Standard update information (Published by Jan 03, 2020) http://jnmglobal.net/thailand-updates-some-wireless-communications-equipment-requirements/  NBTC (Radio/Wireless) 1. CLASS A (Radar / Vehicle equipment, etc.) Lead time: 4...

Taiwan

Taiwan

NCC Lead time:  Needed document Application Manual Photo Documentation (in color showing exterior and interior) Specification of product and antenna Block diagram / Circuit diagram Declaration of model differences Certificate of RF equipment business license...

Sri Lanka

Sri Lanka

TRC (Radio/Wireless) Lead time: 2 weeks (For cellular, 6 weeks) Needed document Application Manual FCC  / CE  Technical files Technical specification Photos Sample: N/A (For cellular, 1 ea normal) Validity: 3 years (For cellular, 3 years) Rate voltage Rated Voltage...

Singapore

Singapore

IMDA(wireless/radio) Lead time: 3-4 weeks Needed document Application Manual Local representative information CE test report Sample requirement: N/A Validity: 5 years PSB/CoC (EMC/Safety) Lead time: 6 weeks Needed document Application Manual CB and CB test report...

Philippines

Philippines

NTC (Telecommunication and Wireless) Lead time: 2-3 weeks Needed documents Application letter Equipment description, data sheet & RF/Technical spec Letter of authorization from the equipment manufacturer to local applicant / agent Local testing: Yes (except RCE)...

Pakistan

Pakistan

PTA (Radio/Wireless) Lead time: 5-6 weeks Needed document Application Manual CE  Technical files Technical specification Photos Sample: 1ea normal & 1ea conducted Validity: Permanent Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard    ...

Nepal

Nepal

NTA (Wireless/radio) Lead time: 12 weeks Needed document Application Manual Technical specification CE test report Sample: N/A Validity: 5years  Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard   CertificateLabel

Myanmar

Myanmar

CE or FCC can coverRate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard           CertificateLabel

Mongolia

Mongolia

CRC Lead time:  Needed document Application Manual Block Diagram Scematics Health & Safety EMC Radio Frequency Notified body opinion / Copy of certificate of conformity granted by accredited body Declaration of Conformity Photos(Internal, External, Test Setup)...

Maldives

Maldives

CAM (Radio/Wireless) Lead time: 4 weeks Needed document Application Manual FCC  / CE  Technical files Technical specification Photos Sample: N/A Validity: Permanent Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard         ...

Malaysia

Malaysia

SIRIM (Radio/Wireless) Lead time: 4 weeks Needed document Application Manual CE test report CE DoC Trade certificate in English Local importer information _ Dagangnet ID Sample: 1 ea normal Validity: 5 years ST CoA(Safety) Lead time: 2-3 weeks Needed document...

Laos

Laos

MPT (Radio/Wireless) Lead time: 1-2 weeks Needed document Application Manual FCC  / CE  Technical files Technical specification Photos Sample: N/A Validity: 1 year Rate voltage Rated Voltage 230 V Frequency 50 Hz Plug Standard     ...

Indonesia

Indonesia

SDPPI 1. Paper work Lead time:1-2 weeks Needed document Application Manual Spec RF and EMC test report from SDPPI - accredited Lab MoU/Distributor agreement between brand holder and applican FR. PM. 5 Sample: N/A Validity: 3 years Remark: local importer information...

India

India

BIS(EMC/Safety) 1) Testing Lead time: about 4-5 weeks Needed document Application Manual CDF (basic information + CCL) : There should be sign or seal of manager/CEO on the every page Software or driver Circuit Diagram Sample: 1 EA Validity: 2 years  2) Registration...

Hong Kong

Hong Kong

OFCA Lead time:  Needed document Application IEC60950 / EN60950 / UL60950 test report with ISO 17025 accreditation logo RF test report with ISO 17025 accreditation logo (for wireless product only) Declaration of equpment identity (if have variant or model number...

China

China

SRRC (Radio/Wireless) Lead time: 9 weeks Needed document Application Manual RF component list Antenna gain Label Photos Sample: 5 ea Conducted CCC (Safety) Lead time: 6 weeks Needed document Application Manual CCL Business license Etc. Sample: 2 ea normal Rate voltage...

Cambodia

Cambodia

TRC(MPTC) Lead time: 3 - 4 week Needed document Application Manual A copy of recognition letter as Import Agent (Distributor) of radio communication and telecommunication equipment or telecommunication service license Technical specification Test report + CoC +...

Brunei

Brunei

AITI (Radio/Wireless) Lead time: 5-6 weeks Needed document Application Manual CE  Technical files Technical specification Photos Sample: N/A Validity: 5 years Rate voltage Rated Voltage 240 V Frequency 50 Hz Plug Standard    ...

Bangladesh

Bangladesh

BTRC (Radio/Wireless) Lead time: 6-7 weeks Needed document Application Manual CE  Technical files Technical specification Photos Sample: N/A or 1ea normal Validity: Permanent Rate voltage Rated Voltage 220 V Frequency 50 Hz Plug Standard...

South Korea

South Korea

KC, EMC Lead time: 2-3 weeks Needed document Application Manual Software or driver Sample: 1EA normal (continuous operation for over 10minutes) Wireless/Radio Lead time: 3-4 weeks Needed document Application Manual Circuit diagram Part layout Antenna report SOP...