Pre-shipment inspection SASO CoC
- Lead time: 1 week
- Needed document:
- Application
- Invoice
- Business License (Exporter/Local Importer)
- Photo for product/Inner and outer packing (showing country of origin)
- Test report
- Validity: Per shipment
SASO IECEE
- Lead time: 3-4 weeks
- Needed document
- Application
- Manual (in English and Arabic)
- CB certificate and CB test report
- Business License (Exporter/Importer)
- Photo for product/ In and outer, marking
- Sample: N/A
- Validity: 1 year
Saber system
- Product listing (Registration on Importer’s account)
- Product certification (certification through CB per model valid for 1 year)
- Shipment certification (Shipment certification per shipment)
- Needed document
- Application
- Manual
- Commercial Invoice
- Photo for product/inner and outer
- Test report
- Importer declaration of Conformity
- Shipping document (BL-invoice/ AWB)
- Certificate of origin
Essential documents and information for factory audit
- Manufacturer’s details.
- ISO 9001 and ISO 14001 certificate of the manufacturer.
- Quality manual of the organization.
- Quality Control Plan of the factory.
- Organizational structure of the establishment.
- Photos for the Factory.
- Photos for product verification test.
- Photos for production line routine test.
- Testing equipment list.
- Factory Audit Application (Attached)
Recent changes to SASO regulations may require factory audits, depending on the product.
CITC (RADIO/Wireless)
- Lead time: 2-4 weeks
- Validity: 2 years
- Needed document
- Application
- Manual (in English)
- CE test report and CE DoC or CE CoC
- Sample: N/A
Rate voltage
Rated Voltage | 220 V |
---|---|
Frequency | 60 Hz |
Plug Standard | ![]() |
Certificate
Label

CITC
Saudi Arabia